Guangzhou Development GAC Toyota Fifth Production Line Distributed Photovoltaic Power Generation Project

Share

     The project can use the roof and parking lot of about25million square meters, and the construction scale is31.94megawatts. The project adopts fourteen large-capacity, high-efficiency, energy-saving, safe and environmentally friendly photovoltaic substations. After the project is put into operation, the annual power generation is expected to reach2,87910,000 kWh, saving coal per year9,443tons, the average annual reduction of carbon dioxide emissions28,703吨。