Zhongshan Automobile Terminal Charging Pile Project

Share

       The charging facilities for new energy vehicles in Zhongshan basically cover all towns and streets, and the charging piles are distributed in all urban areas. However, due to the shortage of land resources and dense population in the urban area, the power supply equipment required by the charging station should not be too large and should not cause noise nuisance.

       A passenger station of Zhongshan Automobile adopts a 800kVA, HAIHONG 10kV Miniaturized Double-layer Prefabricated Substation, which covers an area of 45% less than the traditional substation and has a civil engineering cost of 45% less. The product has a double deck structure, which greatly saves the space and construction cost of the station. The product has an open ventilated 3D wound core dry-type transformer built in, which reduces the combustible content of each transformer by 85% compared with the traditional laminated core transformer, and improves the power supply security. The open ventilated 3D wound core dry-type transformer has low operating noise to avoid disturbing residents.


Addr:
No.3, Huancui West Road, Cuishanhu New District, Kaiping City, Guangdong Province, China
Email:
sales@gdhaihong.com
Service Hotline:
4000-0750-68
Follows:
©2023HAIHONG Electric Co., Ltd.