Shenzhen Version Xiaotangshan Hospital Project

Share

       2020After the outbreak of pneumonia caused by the 2020 novel coronavirus, all confirmed and suspected cases in Shenzhen were treated in Shenzhen Third People's Hospital (National Clinical Research Center for Infectious Diseases). In order to ensure the treatment capacity of Shenzhen during the peak period of the number of patients, the second phase of Shenzhen Third People's Hospital (Shenzhen version of Xiaotangshan Hospital) needs to be expanded. After completion, it will be able to add 1,000 beds to meet the needs of treating patients.

        The 14 substations urgently needed by the project are customized products. HAIHONG’s service team responded in a timely manner and produced 14 customized substations with open ventilated 3D wound core dry-type transformers at the fastest speed. The products have green Environmental protection, three-phase balance, low loss, low noise, small electric field and magnetic field strength, fire and explosion proof, moisture proof, strong overload capacity, strong short circuit resistance and other advantages, together with Shenzhen Third People's Hospital to fight against the epidemic.。


Addr:
No.3, Huancui West Road, Cuishanhu New District, Kaiping City, Guangdong Province, China
Email:
sales@gdhaihong.com
Service Hotline:
4000-0750-68
Follows:
©2023HAIHONG Electric Co., Ltd.